After the re-wiring reached the kitchen, we had to suspend that and turn to doing all the rest of the stuff needed before the kitchen could be re-wired, which basically meant gutting it, re-framing, installing windows, moving the wall, etc. Here's a couple of "before" shots.


Then we began tearing off plaster, removing cabinets, and the like. Here's the kitchen sans cabinets.
No comments:
Post a Comment